Actively executing complex water and wastewater infrastructure projects at scale.
A snapshot of live projects currently under execution, demonstrating VEXL’s capability to manage scope, complexity, and timelines across large infrastructure assignments.
This category highlights VEXL’s ongoing projects across water supply, wastewater treatment, pipelines, and integrated reuse systems. These live assignments reflect our execution bandwidth, project management discipline, and ability to deliver large, multi-phase infrastructure under real-world site conditions.
Case Studies
Ongoing Project
23 KM Pipeline & 1.5 MLD Ultrafiltration-Based WTP – Nagaur
JSW Nagaur, Rajasthan India – 2025
Project Type
Water Reuse & Industrial Supply
Scope
Consultancy, Design, Supply, Laying & Execution
This ongoing project involves end-to-end execution of a 23-kilometer pipeline and a 4.5 MLD ultrafiltration-based water treatment plant. The system treats municipal sewage water from an entire city and supplies high-quality treated water for industrial use. The project sets a benchmark for sustainable urban water reuse and reduced groundwater dependency.
23 km transmission pipeline
4.5 MLD ultrafiltration-based WTP
First-of-its-kind city sewage reuse model
1500 KLD MBR + RO Sewage Treatment Plant
Ambuja Cement Limited – Marwar Mundwa Rajasthan
Project Type
Wastewater Treatment | Turnkey
Scope
Design, Supply, Civil Works & Commissioning
VEXL is currently executing a 1500 KLD sewage treatment plant based on advanced MBR technology integrated with reverse osmosis. The project includes complete civil works, electromechanical installation, and automation. Designed for high-efficiency treatment and reuse, the system supports sustainable water management and reduced freshwater consumption.
1500 KLD treatment capacity
MBR technology with RO integration
High-quality treated water for reuse
Revamping & Upgrade of 300 KLD STP with Ultrafiltration
Ambuja Cement Limited, Marwar Mundwa, Rajasthan
Project Type
STP Revamping & Compliance Upgrade
Scope
Process Upgrade, Equipment Supply & Automation
This project focuses on revamping an existing 300 KLD sewage treatment plant to meet updated pollution control board norms. The scope includes process optimization, integration of an ultrafiltration system, automation upgrades, and infrastructure modifications. The revamp is designed to improve effluent quality, operational reliability, and long-term compliance.
Existing STP performance enhancement
Ultrafiltration-based tertiary treatment
Compliance with updated discharge norms
80 KLD STP Based on MBBR Technology Followed by Ultrafiltration System.
Vedanta Limited (BALCO), Korba, Chhattisgarh
Project Type
Wastewater Infrastructure | Multi-location
Scope
STP Execution, Drainage Network & O&M Support
VEXL is executing multiple sewage treatment plants along with associated underground drainage networks across industrial locations in Jharsuguda. The project involves phased execution, integrated civil and electromechanical works, and coordination across sites. This ongoing assignment reflects VEXL’s capacity to manage concurrent infrastructure projects with consistent quality and performance standards.
Multiple STPs under execution
Integrated underground drainage networks
Phased commissioning approach
Execution Snapshot
Live execution of high-capacity infrastructure
Multi-site coordination and phased delivery
Quality, safety, and timeline control
Provision for commissioning and O&M support